Luxembourg price guide
External render cost in Luxembourg (2026)
Rendering a façade in Luxembourg is priced on a written quote after the firm has measured the walls and seen the old render. The rules around the bill are public: insulating the wall under the render (ETICS) earns Klimabonus aid of 35 € to 140 € per m² in 2026 if an eligible application is submitted before work starts, façade work on a main residence over 10 years old can be invoiced at 3 % VAT, and your commune decides whether a declaration or a permit is needed.
Fynd lists construction companies in Luxembourg with address, phone number and Google rating, and requests free quotes from them for you.

- 35–140 €/m²
- Klimabonus 2026 per m² of insulated outside wall
- 15 cm
- Minimum outside insulation for the lowest aid level
- 3 %
- Possible VAT rate for eligible façade work
- 2.000 €
- Aid for energy advice on a house, if applied for by 30 June 2027
The short version
- Render is priced per job in Luxembourg: ask for a written quote with the measured area in m² and the state of the old render.
- A render on its own earns no state aid; insulating the wall under it earns Klimabonus of 35 € to 140 € per m² depending on the material and the insulation level.
- The application for approval in principle (accord de principe) must be submitted before insulation work starts.
- Façade work on a main residence over 10 years old may qualify for 3 % VAT instead of 17 %, subject to the conditions.
- Check with your commune first: Luxembourg City asks for a declaration of works for façade repairs and a permit in protected areas.
Guide figures are indicative, not provider quotes. Check the written scope, tax and any aid against current official rules.
What sets the price of a façade render
Façade, plastering and painting firms quote a render, or a render on insulation, after measuring the walls and seeing the state of the old render.
These are the points that set the price, and the ones a quote should answer:
| What changes the price | Why it matters |
|---|---|
| Area in m² | Measured wall area, minus or including windows, is the basis of every line |
| Old render | Sound render can be cleaned and re-coated; loose or cracked render has to come off first |
| Insulation or not | Insulation adds boards, fixings and a reinforced base coat, and opens the Klimabonus |
| Insulation material and thickness | Mineral, ecological or fossil boards cost differently and earn different aid |
| Details | Window reveals, sills, the base of the wall and roof edges take time per metre |
| Scaffolding | Height, access and a street permit if it stands on the pavement |
Ask each firm to price the same description, line by line, so you can compare.
Render alone or render on insulation: what the Klimabonus pays
The Klimabonus 2026 pays per square metre of insulated wall, so a new render on its own earns nothing. An external insulation system (ETICS: insulation boards, a reinforced base coat and a finishing render) may qualify if the building and work meet the conditions, including the age and performance requirements.
Aid per m² of outside wall insulated, in euros. The first figure is the base rate; the figure in brackets applies when the approval is requested between 1 January 2026 and 30 June 2027 and invoiced by 31 December 2030.
| Insulation | Level III | Level II | Level I |
|---|---|---|---|
| Fossil (at least 50 % recycled) or other | 35 (40) | 45 (50) | 60 (70) |
| Mineral | 60 (70) | 70 (80) | 85 (100) |
| Ecological | 90 (105) | 100 (120) | 115 (140) |
| Ecological, with cladding | 105 (125) | 115 (140) | 130 (155) |
For a rendered wall, the aid runs from 35–140 €/m², before the supplements below; the cladding line applies only to cladding fixed mechanically over ecological insulation, not to render.
Levels. Level III needs at least 15 cm of insulation outside; level II a U-value of 0,17 W/m²K or less; level I 0,13 W/m²K or less. The thicknesses assume an insulation with a conductivity of 0,035 W/mK.
Other rules. Guichet’s table says fossil insulation needs at least 50 % recycled content, while its technical conditions say more than 50 %. For exactly 50 %, check eligibility with Klima-Agence; some surfaces have exceptions. Insulating only from the inside cuts the aid by 25 %. A supplement of 15 € per m² may apply to qualifying recycled mineral or certified ecological insulation, or a qualifying green façade; ask your adviser about the conditions.
Example. 150 m² of outside wall with mineral insulation at level I, with an eligible application in the transition period: 150 × 100 € = 15.000 € of aid.
How to claim the Klimabonus: energy advice and approval first
There are two routes, and both start before any work is done.
| Route | Who draws up the project | What else it brings |
|---|---|---|
| With energy advice | An approved energy advisor (conseiller en énergie agréé) | Aid for the advice: 1.700 € for a single-family house, or 2.000 € if the approval is requested between 1 January 2026 and 30 June 2027. A bonus of 20 %, 30 % or 50 % on envelope work if the energy class rises by two classes or more, to C, B or A |
| Single element, without energy advice | An approved firm, for one part of the envelope only, such as the outside walls | Same rate per m², no advice aid, no class bonus |
The steps.
- Book the free basic energy advice from Klima-Agence (8002 11 90), financed by Klima-Agence and your commune.
- Have the advisor or the approved firm define the work, and ask the commune whether it needs a permit.
- Request the approval in principle (accord de principe) from the Guichet unique des aides au logement, on MyGuichet.lu or with form DEPA-2026, before work starts.
- After the work, send the firm's confirmation form CONF-2026, the invoices and proof of payment, within four years after 31 December of the invoice year.
From 1 January 2027, a firm on the register of intermediary applicants can deduct the aid directly from your invoice (pre-financing). The accord de principe is still required first.
Which VAT rate applies to façade work
The standard VAT rate in Luxembourg is 17 %. Work on a home used as a main residence, built at least 10 years before the work starts, can be invoiced at 3 %. guichet.lu names "les façades" and "le plâtrage de bâtiment" (plastering) on the list of eligible work.
| Situation | VAT |
|---|---|
| Façade of a main residence built at least 10 years before the work | 3 % if eligible |
| Other cases | Check the applicable rate |
| Tax advantage per dwelling | capped at 50.000 € |
The firm invoices 3 % directly once the AED has approved the application, filed before work starts, provided the work and dwelling are eligible. If eligible direct application is unavailable, ask AED whether a refund is possible; the refund route has its own conditions: the claim must cover more than 3.000 € excluding VAT over at least six months, and each invoice must exceed 1.250 € excluding VAT.
Example. On 30.000 € of façade work excluding VAT, VAT is 5.100 € at 17 % and 900 € at 3 %.
The AED’s direct-application guidance says the projected quotes must total at least 3.000 € excluding VAT. Several quotes from the same supplier can be included in one application. This is separate from the conditions for a refund.
Does a façade change need a permit from the commune?
The building permit (autorisation de bâtir) is issued by the mayor, and each commune's building regulation decides which façade work needs it. Klima-Agence tells owners to check with the commune before insulating, and an approved energy advisor can prepare the file if one is needed.
| Commune rule | What it says |
|---|---|
| Luxembourg City, façade repairs | Declaration of works (déclaration de travaux), sent in writing to the mayor at least 10 days before work |
| Luxembourg City, protected area (secteur protégé) | Building permit for any exterior work, including façade restoration |
| Differdange, insulation over the pavement | The mayor can allow insulation and its finish to project onto public land, up to 0,25 m in total, if 1,20 m of pavement remains |
| Differdange, new buildings | Façades must be rendered within 2 years of handover, unless another cladding is authorised |
| Differdange, scaffolding | Needs the mayor's authorisation |
Scaffolding on the street. In Luxembourg City, scaffolding that obstructs the public road costs 12 € per m² per month in the centre and 6 €, 3 € or 1,50 € elsewhere, with a minimum of 30 €. The application goes to the Service Circulation at least five working days before work starts.
Architect. guichet.lu exempts from an architect's plans only interior work that does not touch the structure, the façade or the roof. If your commune requires a permit for the façade, expect to need plans.
How to compare façade quotes
Give at least two firms the same description of the façade and ask them to measure it. Check how each quote counts windows and reveals, and whether the old render will be cleaned and covered or removed. Ask what preparation, scaffolding and waste removal are included.
If you plan to insulate, ask the firm to identify the material and thickness and explain the Klimabonus performance level it aims to reach. Agree who will submit the application for approval in principle before work begins. Check whether a road-occupation permit is needed for the scaffolding, what VAT applies and who will request any AED approval.
Check the provider’s authorisation for the work. Different rules can apply to a business established abroad that works temporarily in Luxembourg.
FAQ
How much does it cost to render a house in Luxembourg?
A render is priced per job, from the measured wall area and the state of the old render. Get at least two written quotes based on the measured area, with the old render, the details and the scaffolding priced separately.
Is there a subsidy for re-rendering a façade?
Not for the render alone. The Klimabonus 2026 pays 35 € to 140 € per m² when the outside wall is insulated, depending on the material and the insulation level.
Do I need an energy advisor?
For the full energy-renovation route, yes, and the state pays 1.700 € towards it for a house, or 2.000 € if the approval is requested by 30 June 2027. Insulating only the outside walls can go through the single-element route with an approved firm instead.
Can work start before the Klimabonus approval?
The application for the accord de principe must be submitted before work starts. Ask your adviser about the timing and conditions for your project.
Do I need a permit to insulate or re-render my façade?
It depends on your commune. Luxembourg City asks for a declaration of works for façade repairs and a building permit in protected areas; ask your commune before you sign.
Next steps
- Book the free basic energy advice from Klima-Agence, and ask your commune whether the façade needs a declaration or a permit.
- If you insulate, have an approved advisor or firm request the accord de principe, before work starts.
- Ask each firm for the measured area, the treatment of the old render, the Klimabonus level reached and the VAT rate.
- Describe the job once on Fynd and compare the written quotes you receive.
Sources
- Guichet.lu: Klimabonus 2026: rénovation énergétique sur base d'un conseil en énergie
- Guichet.lu: Klimabonus 2026: rénovation énergétique sans conseil en énergie, un seul élément
- Klima-Agence: Les étapes clés pour isoler mon logement
- Klima-Agence: Klima-Agence (hotline and appointments)
- Guichet.lu: Remboursement de la TVA sur la construction et la rénovation d'un logement
- Administration de l'enregistrement, des domaines et de la TVA: Note explicative, demande d'application directe du taux de 3 % de TVA
- Portail fiscalité indirecte (AED): Taux nationaux applicables
- Guichet.lu: Autorisation de bâtir
- Ville de Luxembourg: Statement of work
- Ville de Luxembourg: Building permit
- Ville de Luxembourg: Obstructing public thoroughfares
- Ville de Differdange: Règlement sur les bâtisses, les voies publiques et les sites (2023)
- Guichet.lu: Métier principal de l'artisanat (liste A)