Questions to ask before hiring a craftsman in Luxembourg
Before you sign with a craftsman in Luxembourg, ask about what the price does not show: the business permit, the insurance the firm holds, how extra work is agreed, how much you pay up front, who files permits and how the work is handed over. As a rule no insurance is compulsory for building contractors, and the 2 and 10-year guarantees start only at handover, so the answers matter. This guide lists the questions, why each one matters and what Luxembourg law says.
Fynd lists handymen in Luxembourg with address, phone number and Google rating, and requests free quotes from them for you.
Ask for the business permit number, or the QR code that must appear on the quote, and check it in the guichet.lu search. Then ask:
Which of the trades in my job does your permit cover? A bathroom can involve plumbing, tiling and electrics, each a separate trade.
Will you subcontract any part, and to whom? Each subcontractor needs its own permit, and the main contractor must check it (Chambre des Métiers).
Who will be on site, and who is my contact during the works?
02
Which insurance do you hold, and what does it cover?
The Chambre des Métiers states that, as a rule, no insurance is compulsory for building contractors in Luxembourg. Architects and consulting engineers are different: the law of 13 December 1989 requires them to insure their professional liability, including the 10-year liability. So ask the firm, and ask for the certificate.
Policy
What it covers
When to ask
Third-party liability (RC exploitation)
Damage caused to third parties while the firm works, for example to a neighbour
Every job
Contractors' all risks (TRC)
Accidental damage, defective materials, poor workmanship and plan errors, during the works and sometimes a few months after
Larger renovations
Decennial insurance (assurance décennale)
Repairs owed under the 10-year liability; the insurer checks the work before giving cover, which then runs 10 years from handover
Structural work
The legal liability exists whether or not the firm is insured. Insurance matters when the firm cannot pay or no longer exists.
03
How will extra work and price changes be agreed?
Renovation often uncovers something unplanned. Agree the rule before it happens.
Is this quote an estimate or a fixed price (forfait)? On an estimate you pay the measured quantities; on a fixed price, changes need a contract clause or a written agreement (Chambre des Métiers).
Will you warn me in writing before the total goes above the quote? A considerable overrun without warning can be held against the firm.
What hourly rate including VAT applies to unplanned work, and how is travel charged?
Ask for each change as a short written addendum with its price, before the work is done.
04
How much do you need up front, and when is the rest due?
The deposit for renovation work is set in the contract, and firms' terms vary: Isotrade, for windows and shutters, asks for 50 %.
Tie each later payment to a finished, visible stage.
Keep a final share until handover. Full payment is one of the signs courts use to find that you accepted the work tacitly, which also starts the guarantee periods (Chambre des Métiers).
Signed at home? 14 days to withdraw. A contract signed at your home with the firm present is an off-premises contract: you can withdraw within 14 calendar days without giving a reason (guichet.lu). If the firm did not inform you of this right, the period is extended by 12 months. The right does not apply to urgent repairs you called the firm for, to contracts of 50 € or less, or to new builds and substantial transformations of an existing building (Consumer Code). If you ask the firm to start within the 14 days and then withdraw, you pay for the work already done.
05
Who applies for permits, and who handles the VAT form?
Ask who files what, and whether the cost is in the quote.
Paperwork
Rule
Question
Building permit
In Luxembourg City, for example, needed for alterations to walls and partitions, load-bearing structures and roofs, and changes of use (VdL); an architect is required unless an interior transformation leaves structure, façade and roof untouched (guichet.lu)
Do you prepare the file, and do I need an architect?
Declaration of works
In Luxembourg City, at least 10 days before major indoor maintenance or façade and roof repairs (VdL)
Who sends it?
3 % VAT agrément
Filed by the firm with the AED before work starts, countersigned by you, for quotes of at least 3.000 € excluding VAT (guichet.lu, AED note)
Will you file it, and when?
Co-ownership vote
Works on common parts or the outside appearance need the general meeting's approval (law of 16 May 1975)
Can you give me a description for the meeting?
Rules differ from one commune to the next, so check your commune's building regulation before work starts.
06
How will the work be handed over?
Handover (réception) is the moment the guarantees start, so agree how it will happen (Chambre des Métiers).
Will we sign a handover report (procès-verbal de réception)? Without one, handover can be tacit: moving in, paying in full and raising no complaint can count.
Can I note reservations? Defects noted as reservations in the report delay the start of the guarantee for those items.
What happens before handover? Until then the firm owes the promised result under ordinary contract law.
Guarantee
Covers
Runs
10-year (décennale)
Major works (gros ouvrages)
10 years from handover
2-year (biennale)
Minor works (menus ouvrages)
2 years from handover
These periods come from articles 1792 and 2270 of the Civil Code, and a clause that excludes them is void (Chambre des Métiers).
07
Where to turn if you disagree later
Start with the firm, in writing, and keep a copy. If that fails:
Helps you and the firm reach an agreement or proposes a solution, normally within 90 days of a complete file, with extensions possible for complex cases; you must first have tried to contact the firm; either side can leave at any time
Consumer association; advice from advisers and lawyers for members
First consultation free
Requests to the Médiateur can be written in Luxembourgish, French, English or German.
08
FAQ
What is the first question to ask a craftsman?
Ask for the business permit number or QR code, and check that the permit covers your trade.
Must a Luxembourg craftsman be insured?
As a rule no insurance is compulsory for building contractors, according to the Chambre des Métiers. Architects and consulting engineers must insure their professional liability. Ask the firm which policies it holds and for the certificate.
How much deposit is normal?
It is set in the contract. Agree the deposit in writing, tie later payments to finished stages and keep a final share until handover.
Can I cancel a contract I signed at home?
Usually yes, within 14 calendar days. Not for an urgent repair you called the firm for, a contract of 50 € or less, a new build or a substantial transformation.
When do the 2 and 10-year guarantees start?
At handover (réception), ideally recorded in a signed report. Reservations delay the start for the items concerned.
09
Next steps
Ask for the permit number or QR code, check it on guichet.lu, and ask for the certificate of each policy the firm holds.
Agree in writing whether the quote is a forfait, how extra work is priced, and who files the permits and the 3 % VAT agrément.
Keep a final payment until you sign a handover report that lists any reservations.
Describe the job once on Fynd and put these questions to the firms that quote.