How to compare renovation quotes in Luxembourg

To compare renovation quotes in Luxembourg, make sure they price the same work, at the same VAT rate, on the same terms. First check whether each quote is an estimate, where the final price follows the measured quantities, or a fixed price. Then compare line by line, add the lines up yourself and confirm whether the firm will apply the 3 % housing VAT rate or 17 %. One published sample quote has lines that sum to 2.470 € less than its stated total.

Fynd lists renovation companies in Luxembourg with address, phone number and Google rating, and requests free quotes from them for you.

3 %
VAT on eligible home renovation (standard rate 17 %)
50.000 €
Cap on the 3 % VAT advantage per dwelling
2.470 €
Gap between lines and total in one published sample quote
27 %
Overrun on an estimate a court held partly against the firm

The short version

  • A quote must state the total including VAT, in writing.
  • In Luxembourg a quote is an estimate unless a fixed price (forfait) was clearly agreed.
  • Add the lines up yourself: one published sample quote has lines that sum to 2.470 € less than its total.
  • Compare quotes at the same VAT rate: 17 % standard, or 3 % with the AED agrément (quotes from 3.000 € excluding VAT), capped at 50.000 € per dwelling.
  • Read validity, travel, deposit and lead time: they change what you actually pay.
In this guide
  1. What every quote must state
  2. Estimate or fixed price: what you are signing
  3. Compare line by line, not total against total
  4. Add the lines up yourself: a worked example
  5. VAT: 17 % or 3 %, and who files the request
  6. Terms that change what you pay
  7. FAQ
  8. Next steps

What every quote must state

Luxembourg price rules give you a baseline for every quote (guichet.lu).

  • A total including all taxes. A quote must state the total amount to pay, VAT included.
  • The calculation method if the price is open. When the final price cannot be fixed in advance, the firm must state how it will be calculated, for example the hourly labour rate including VAT and the travel charge.
  • In writing. Prices given only orally do not meet the rule.
  • The firm's permit. Since 2023 the QR code or the business permit number must appear on quotes and invoices (Chambre des Métiers).

A quote that misses one of these is not necessarily dishonest, but ask for a corrected version before you compare it.

Estimate or fixed price: what you are signing

Under Luxembourg case law summarised by the Chambre des Métiers, a quote is an estimate (devis) unless the parties clearly agreed a fixed price (forfait). The client who claims a fixed price must prove it.

Estimate (devis)Fixed price (forfait)
Price basisUnit prices; final price on the measured quantitiesOne price for clearly defined work
More work than estimatedYou pay for the extra quantitiesThe firm bears it
ChangesThe firm must warn you of a considerable overrunOnly by contract clause or written agreement

With a fixed price the firm also bears rises in material and labour costs, unless a valid price-variation clause says otherwise. On an estimate, a considerable overrun without warning is a fault: in one case a court made the contractor carry 15 % of an overrun above 27 %. If you want a fixed price, ask for the word forfait and a precise description of the work in the quote.

Compare line by line, not total against total

Rebuild the quotes in one table with the same rows. Where one firm has a line the others lack, ask the others whether it is included elsewhere or missing.

CheckWhat to look for
QuantitiesThe same m², metres and units in every quote, matching your own measurements
UnitPer m², per metre, per unit or lump sum: convert before comparing
Unit priceExcluding VAT (HT) or including it (TTC): Avenir Rénovations' published sample quotes, for example, list unit prices excluding VAT with a 17 % VAT column
Demolition, protection, wasteListed by one firm, assumed or forgotten by another
ProductsBrand and model, or "or equivalent"
ExclusionsPainting, electrics, permits, scaffolding: what each firm leaves out

Add the lines up yourself: a worked example

Avenir Rénovations publishes a sample quote for an attic conversion with 50 m² of new floor. Its lines are clear, which makes the check easy.

Group of linesExcl. VAT
Structure: roof frame adaptation, timber floor, stair opening12.590 €
Roof windows: openings and fitting1.620 €
Electrics: 9 lines3.805 €
Insulation, plasterboard, partitions, doors19.130 €
Painting, laminate, skirting9.710 €
Sum of the listed lines46.855 €
Total stated on the page49.325 €
Difference2.470 €

The stated total including 17 % VAT, 57.710,25 €, matches 49.325 € excluding VAT, so the gap sits between the lines and the total. On a real quote, ask the firm in writing which item the difference covers before you sign.

VAT: 17 % or 3 %, and who files the request

The standard VAT rate is 17 % (VAT law, art. 39). Eligible renovation work on a main residence can qualify for 3 % under conditions. Routes include work on a home at least 10 years old or improvements completed within five years of acquisition; the advantage is capped at 50.000 € per dwelling (guichet.lu).

  • Direct application. The firm files the request (agrément) with the AED before work starts, and you countersign it. The quotes must total at least 3.000 € excluding VAT; several quotes from the same firm can be combined (AED note). The invoice then shows 3 %.
  • Refund afterwards. Without an agrément the firm invoices 17 % and you claim the difference back. The claim must exceed 3.000 € excluding VAT, cover at least six months and include invoices each above 1.250 € excluding VAT.
  • Not eligible: furniture including fitted kitchens, interior joinery other than stairs, doors and window sills, alarms and home automation, air conditioning, interior blinds, architect and engineer fees.

On Avenir's sample total of 49.325 € excluding VAT, 17 % VAT is 8.385,25 € and 3 % is 1.479,75 €: a difference of 6.905,50 € if every line were eligible. Bring all quotes to the same rate before comparing, and ask each firm whether it will file the agrément.

Terms that change what you pay

Two quotes with the same total can cost different amounts once the terms apply. Isotrade, a window and shutter firm in Luxembourg, publishes its terms, which shows what to look for.

TermIsotrade's published termWhat to ask every firm
ValidityOnline prices valid 7 days; the final written quote prevailsHow long does the price hold?
Travel+120 € excluding VAT per interventionIs travel included, and is it per visit or per job?
Deposit50 %How much up front, and what triggers each later payment?
Lead timeFitting 5–7 weeks after validationWhen does work start and end?

Also check who obtains any building permit or declaration, and whether its cost is in the quote.

FAQ

Should I take the cheapest quote?

Only once the quotes cover the same quantities, products and exclusions and use the same VAT rate. A lower total often means a line is missing.

Can the final invoice be higher than the quote?

Yes, if the quote is an estimate and the measured quantities turn out larger. A considerable overrun without warning can be held against the firm; with a fixed price, changes need a written agreement.

Which VAT rate should a renovation quote show?

Ask each firm which VAT treatment applies. The standard rate is 17 %; eligible work may receive 3 % after AED approval, while some suppliers may qualify for an exemption. Check the conditions before comparing totals.

What if the lines do not add up to the total?

Ask the firm in writing to explain the difference and to send a corrected quote before you sign.

How many quotes should I compare?

Two or three quotes on the same written brief are usually enough to see which lines are missing.

Next steps

  • Send the same written brief to two or three firms, with your own measurements.
  • Rebuild the quotes in one table with the same rows, add up each quote's lines yourself and ask in writing about any gap.
  • Ask each firm whether its quote is a forfait, whether it will file the AED agrément for 3 % VAT, and how long its price holds.
  • Describe the job once on Fynd and compare the written quotes you receive.

Sources

  1. Guichet.lu: Indication des prix des produits et des services
  2. Chambre des Métiers: Le code QR des entreprises
  3. Chambre des Métiers: Droit de la construction, fiche 2 : devis ou forfait ?
  4. Guichet.lu: Taux de TVA super-réduit de 3 % pour le logement
  5. Administration de l'enregistrement, des domaines et de la TVA: Loi TVA, version 1er janvier 2026
  6. Administration de l'enregistrement, des domaines et de la TVA: Note explicative, demande d'application directe du taux de 3 % de TVA
  7. Avenir Rénovations: Prix aménagement des combles au Luxembourg (devis type)
  8. Avenir Rénovations: Estimation pour une rénovation d'appartement au Luxembourg (devis type)
  9. Isotrade: Volet roulant rénovation Luxembourg

Related price guides

Next step

Find and compare providers for this project

Compare the same scope of work, exclusions and timing with each provider. Prepare your request, then choose who to contact.

Fynd connects this guide to provider profiles, so price research can move into provider selection.

What to compare in quotes

  • Use the same room-by-room scope; compare who coordinates the trades, what is excluded, payment stages and the procedure for additional work.
  • A room-by-room scope that separates demolition, plumbing, electrical, plastering, flooring, painting, waste, and project management.
  • Permit, VAT, insurance, decennial liability, and subcontractor responsibility stated before the first payment.
  • A change-order process for hidden defects, material upgrades, schedule changes, and provisional sums.